Finish remaining projection PRs, coordinator release, and approved deploy

Remaining: core merge queue; CLI adapter PR after the active transport PR lands; remaining Embedded and WUI PRs; publish coordinator from merged main; ask user before production deploy.

Blocked by hf-2026-09-24-finish-s1078e-projection-close-restart-and-regression-gates: Rebased branch wip/1078-rebased-W77 @27d26067 is green on its gates and offered on PR 1078; waiting for the PR owner to incorporate it (supersede with a separate PR if no response by 17:00 UTC)

Handoff document

Markdown

Remaining buildtest projection work (verified 2026-09-27)

Original user request: The https://buildtest.kotlin.build/runs projections were out of date. Find and fix the root cause, make run-result reads fast, prevent stale or mixed build artifacts, and land the related fixes. Only deploy after explicit user approval.

The original handoff snapshot is stale. Original forensic evidence remains at https://github.com/CodexCoder21Organization/PlanRepository/tree/evidence/PROJRESET-2026-09-23/evidence/PROJRESET-2026-09-23; the original handoff web view keeps its revision history. BuildTestWui https://github.com/CodexCoder21Organization/BuildTestWui/pull/339 and kompile-cli https://github.com/CodexCoder21Organization/kompile-cli/pull/175 are merged. Current production health read: projectionFeedResetRequired=false, projectionFeedGapDetected=true, backfillComplete=true, projectionFeedConnected=true. No production change was made by W53.

Repository Current work Verified state
kompile-core https://github.com/CodexCoder21Organization/kompile-core/pull/324 OPEN at 479a15da65f7371677bf00685bc45075867885bc; all six branch checks passed. Another actor enqueued it at 05:49 UTC; merge queue checks were pending at the last read. Manager 0.0.191 published and POM/JAR both HTTP 200. W53 added fail-first answered-error tests and a classification fix; 9/9 selected local tests pass. Two review passes found no remaining issue.
kompile-cli https://github.com/CodexCoder21Organization/kompile-cli/pull/172 OPEN, green, owned by another actor. It changes the same transport adapter and reserves CLI 0.0.113. Do not overwrite it.
kompile-cli https://github.com/CodexCoder21Organization/kompile-cli/tree/wip/cli-adapter-W53 W53 WIP stacked on the active transport PR. Final W53 head 2d82f6e2c888e42f9f29513a77232524401fd1c0. It pins manager 0.0.191, marks explicit and malformed service replies with the core response type, and keeps two real-process consumer tests. New CLI coordinate 0.0.114 is unpublished. Both adapter tests failed before their fixes; the final five selected local tests passed 5/5. Two review passes found no remaining issue. Do not open a main-targeted PR until the active transport PR lands; then rebase and run focused tests again.
kompile-cli https://github.com/CodexCoder21Organization/kompile-cli/pull/176 OPEN, stale red wrong-layer implementation of a five-minute read replay. Replace with the upstream core fix plus focused CLI adapter after it is reviewed; then close this superseded PR with an explicit comment.
BuildTestEmbedded https://github.com/CodexCoder21Organization/BuildTestEmbedded/pull/1079 OPEN at ef78fd1212add6e2a288f937c527dde10f2918ed; failing checks at 06:13 UTC. Another actor updated it today. W53 did not touch it.
BuildTestEmbedded https://github.com/CodexCoder21Organization/BuildTestEmbedded/pull/1078 OPEN at 1db31ca20484f2c1766fc8293de5ec624cb4bb30; all branch checks green at 06:13 UTC after another actor updated it. W53 did not touch it.
BuildTestEmbedded https://github.com/CodexCoder21Organization/BuildTestEmbedded/pull/1080 OPEN, stale red. Needs current-main rebase and review after its prerequisite fixes land.
BuildTestWui https://github.com/CodexCoder21Organization/BuildTestWui/pull/338 OPEN, stale red. Needs coordinator artifact pin and coverage review after 1079 lands.

Remaining order: (1) Let the already-green core PR finish its merge queue checks; only the orchestrator may merge. (2) After the independent CLI transport PR lands, rebase W53 CLI WIP onto latest main, rerun the five focused tests, and open a main-targeted PR with a why-first description. The fail-first and review work is already recorded in findings.md in this lane. (3) Resolve the still-open Embedded and WUI PRs and publish the coordinator artifact from merged main. (4) Ask the user for production deploy approval; no worker deploy is authorized.

Production read-only path check: coordinator points to buildtest-server-hotfix-embedded-0.0.68290276-20260924.jar; WUI points to buildtest-wui-faf14af1-20260924.jar. The planned old coordinator coordinate 0.0.69231611 is unpublished; latest published metadata observed 0.0.69270330, while Embedded main declares 0.0.69262241. Recheck these before any pin or release.

No status reports yet.